1. Consultancy Services for Authority’s Engineer for Supervision of civil construction works for Construction of Northern Kota Bypass from Design Ch. 0.000 (km 391/100 of NH-76) to Design Ch. 10/300 (Rangpur road) [Package – I] and from Design Ch. 10/300 (Rangpur road) to Design Ch. 14.200 (km 11/700 of SH-33) with link road of 452m length with SH-33 [Package – II] in the state of Rajasthan on EPC mode under NH (O); Length: 14.2 Km; 2 Lane with paved shoulder; Flexible Pavement. Total Length – 14.2 Km, 2 Lane with Paved Shoulders, Project Cost – 150 Cr.
2. Independent Engineer services for development and construction of Two laning with paved shoulder of Salasar – Nagaur section of NH-65 from Km 45.400 (Design Chainage 151.141) to Km 171.170 (Design Chainage 270.735) – Design length (119.594 Km), Total Length – 119.594 Km in the State of Rajasthan on Hybrid Annuity mode under NHDP Phase-IV. Total Length – 119.59 Km, 2 Lane with Paved Shoulder, Project Cost – 480 Cr.
3. Consultancy Services for Authority’s Engineer for Widening to 4-lane with paved shoulder with CC pavement from km 256/550 to km 292/500 on Kota-Darah Section of NH-12 (Kota-Jhalawar Road) in the State of Rajasthan on EPC mode; Length: 43.450 Kms; 4 Lane; Rigid Pavement;
1. Independent Engineer services for Six Laning of Thaliparambha-Muzhapilangad section from Km 137.900 to Km. 170.600 of NH-17 (New NH-66) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode. Total Length – 29.948 Km.; 6-Lane; Project Cost Rs. 1438.98 Crores.
2. Independent Engineer services for Six Laning of Thalapady to Chengala section of NH-17 (New NH-66) from Ch. 17+200 (ex. km 17+200) to Ch. 56+200 (ex. Km 57+200) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode (N/04002/05001/KL). Total Length – 39 Km.; 6-Lane; Project Cost Rs. 1224.46 Crores.
3. Consultancy Services for Authority’s Engineer for Supervision of Construction of Eight Lane access-controlled expressway starting from MP/Gujarat Border near Chhayan village and ending at Junction with NH-47 near Bhamaiya Village in Panchmahal District (Ch. 696+920 to Ch. 781+282) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat [Delhi-Vadodara/NH-148N/AE/Pkg11]. Total Length – 85.47 Km, 8-Lane, Project Cost – 3105.39 Crores.
4. Independent Engineer services for Six Laning of Neeleshwaram to Thaliparambha section of NH17 (New NH-66) from Ch. 94+540 (ex. km 96+450) to Ch. 134+650 (ex. Km 137+900) under Bharatmala Pariyojna in the state of Kerala on Hybrid Annuity Mode. Total Length – 40.11 Km, 6-Lane, Projecct Cost – 1490.96 Cr.
5. Consultancy services for Independent Engineer for supervision of Construction of Eight-lane Vadodara-Mumbai Expressway from Ch. 103.400 to Ch. 190.000 (Talasari to Gandeva section of Vadodara-Mumbai expressway) in the state of Gujarat, UT of DNH and Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana. Total Length – 86.6 km, 8-Lane, Project Cost – 3523.51 Cr.
6. Supervision Consultancy Services for construction supervision of the Rehabilitation and Reconstruction work and other incidental works of Deoli-Kota section (Design Km.167.624 to Km. 250.144) Section of NH- 12 (New NH- 52) in the state of Rajasthan. Total Length – 82.52 Km, 4-Lane, Project Cost – 353.55 Cr.
7. Consultancy Services for Authority’s Engineer for Supervision of i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) – TSP”. Total Length – 36.95 Km, 2-Lane, Project Cost – 419.16 Cr.
8. Independent Engineer Services for supervision of Four Laning of Dhrol – Bhadra Patiya section of NH-151A (Between Ex. Km 5+700 to Km 13+600 of SH-25) and Bhadra Patiya – Pipaliya Section of NH-151A (Between Ex. Km 73+000 to Km. 44+800 and Ex. Km. 38+350 to 24+000 of CSH-6) in Gujarat through Public Private Partnership (PPP) on Hybrid Annuity mode. Total Length – 50.41 Km, 4-Lane, Project Cost – 702.63 Cr.
9. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km (-) 0+300 to km 88+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) [AJ/Construction Supervision/Package-1]. Total Length – 88.30 Km, 6-Lane, Project Cost – 1590.67 Cr.
10. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield months) highway from km 28+700 to km 53+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-2]. Total Length – 82.00 Km, 6-Lane, Project Cost – 1203.37 Cr.
11. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 53+000 to km 88+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-3]. Total length – 82.50 Km, 6-Lane, Project Cost – 1332.78 Cr.
12. Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane access controlled Greenfield highway from km 1+900 to km 90+000 of Rasisar (near Bikaner)-Deogarh (near Dhandhaniya) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) [AJ/Construction Supervision/Package-4].
13. services for Authority’s Engineer for Supervision of
(i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 32.00 Package -1,2 & 3 in the state of Nagaland Under SARDP-NE on EPC Mode. Total Length – 32 Km, 2-Lane, Project Cost – 467.61 Cr.
14. Consultancy services for Authority’s Engineer for Supervision of
i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.00 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package IV)
(ii) Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under NH(O) – TSP in the state of Nagaland in EPC mode. Total Length – 37.70 Km, 2-Lane, Project Cost – 367.88 Cr.
16. Independent Engineer Services during Operation & Maintenance Period of Two lane with Paved Shoulder with Provision of Capacity Augmentation of Rajasthan Border – Fatehpur-Salasar Section of NH-65 in the State of Rajasthan on BOT basis under NHDP Phase-IV. Total Length – 154.14 Km, 2-Lane with Paved Shoulders, Project Cost – 558.12 Cr.
17. Independent Engineer Services during Operation & Maintenance stage of (1) Four laning of Jaipur-Reengus Section of NH-11 (New NH-52) from Km 246.300 to Km 298.075 on BOT (Toll) basis on DBFOT pattern under NHDP Phase-III (Length : 51.842 KM) in the state of Rajasthan. Total Length – 51.84 Km, 4-Lane.
18. Independent Engineer Services during Operation & Maintenance stage of Four laning of Reengus-Sikar section of NH-11 (New NH-52) from Km 298.075to Km 341.962 of NH-11 (New NH 52) on BOT (Annuity) basis on DBFOT pattern under NHDP Phase-III (Length : 43.887 KM) in the state of Rajasthan. Total Length – 43.88 Km, 4-Lane.
19. Independent Engineer Service during Operation & Maintenance stage of selected road stretches under BOT projects in the state of Rajasthan. [ 4 Lanning of Gomati Chouraha Udaipur Project NH- 8 Km. 177+000 to 260+100 (Total Km. 79.31)]. Total Length – 79.31 Km, 4-Lane.
20. Independent Engineer Services during Operation & Maintenance stage of 6 laning of Jaipur – Kishangarh NH-8 Km 273.500 to 363.885 total lengths – 90.385 under BOT projects in the State of Rajasthan. Total Length – 90.38 Km, 6-Lane.
21. Independent Engineer Services for O&M stage of 6-laning of Indore-Dewas Section of NH-3, from Km. 577.550 to Km. 610.00 and Km. 0.000 to Km. 12.600 (Approx. Length 45.05 Km.) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) Project on DBFOT pattern. 6-Lane; Total Length – 45.05 Km.; Cost Rs. 325 Crors. Client: NHAI.
22. Consultancy Services for Preparation of Feasibility Study report cum preliminary design report for Two-Laning of Golyana-Nawalgarh (MDR-25B) (the “Highway”); Totaling 24.00 km. (The “Project”). Total Length – 24 km, 2-Lane, Project Cost Rs. 54.00 Crores.
23. Consultancy Services for Preparation of Feasibility Study report cum preliminary design report for Two-Laning of Mal Bamori-Mangrol – Baran (SH-01) (the “Highway”); Totaling 41.20 km. (The “Project”). Total Length – 41.20 Km, 2-Lane, Project Cost Rs. 125 Crores.
24. Consultancy services for “preparation of DPR for Construction of Bypasses at Kotputli & Narheda” complete as per requirement, guideline, scope of work (enclosed) and direction of Engineer-in-charge including GST & all other Taxes as applicable. (Approx Length of Bye-Pass: Kotputli-10 Km, Narheda: 3.50 Km). Total Length – 13.50 km, 2-Lane, Project Cost – 135 Cr.
25. Consultancy Services for preparation of DPR for green field Chambal Expressway in the State of MP/UP/Rajasthan. Total Length – 404 Km, 4-Lane, Project Cost – 12000 Cr.
26. Consultancy Services For Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Yevat Malshiras Saswad Kapurhol Bhor Mandhardev Wai Surur road , Tal- Bhor & Wai. Dist.Satara & Pune – Package- 5. Total length – 57.96 Km, 2-Lane, Project Cost – 149.99 Cr.
27. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to SH 9 to Dalaj Kalas Natepute Shinganapur Dahiwadi Pusesavali Karad SH-124 Section -Shingnapur Dahiwadi Pusesavali to Karad Dist. Satara – Package- 6. Total Length – 82 Km, 2-Lane, Project Cost – 246 Cr.
28. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Malharpeth – Umbraj -Masur-Mayani Dighanchi Pandharpur road SH 143 Section – Malharpeth Umbraj Masur Mayani to Satara Dist Border Dist. Satara – Package- 7. Total Length – 60 km, 2-Lane, Project Cost -180 Cr.
29. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Pandharpur Degaon Chincholi Takalisikandar Kurul to join SH 202 Road MDR 66 Km 0/000 to 33/900 Dist. Solapur- Package- 10. Total Length – 33.9 km, 2-Lane, Project Cost – 101.7 Cr.
30. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Chandgad Ibrahempur Chitale Shrugarwadi Ajar Burude Honewadi Mhagaon vyragewadi Hasur Sasgiri Narwad Halkarni Khanpur to Dist. Border State Highway No.201 Dist. Kolhapur and Improvement to Gargoti Pushpanagar Sonarwadi Madur Sheloli Vengrul Mamadapur Navale Vesarde Bagewadi Ukirbhatale Chakrewadi Palyach Huda Mathgaon Mani Patgaon Vanyashiwadi Shrigoan road MDR 52 Dist. Kolhapur- Package- 12. Total length – 81 km, 2-Lane, Project Cost – 212.25 Cr.
31. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Pusesavali Vangi Nagthane Walwa Borgaon Bahe Tambave Kasegaon Wategaon Takave road SH-158 km. 0/00 to 70/00 Tal.Walwa Dist. Sangli Package- 13. Total Length – 70 Km, 2-Lane, Project Cost – 210 Cr.
32. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Improvement to Pusesavali Vangi Nagthane Walwa Borgaon Bahe Tambave Kasegaon Wategaon Takave road SH-158 km 70/00 to 147/500 Tal.Walwa Dist. Sangli Package- 14
33. Consultancy Services for Feasibility Study And Detailed Project Report For The Highway Projects Under Maharashtra Road Improvement Project (MRIP) With Financial Assistance From Asian Development Bank (ADB) Widening and improvement to pimparkhed girad pachora khadakdevla warthan ghatnandra shelgson nachanvel babras kanhori phulambri road, SH 48 in Tq Phulambri and Dist. Aurangabad -Package- 29. Total Length – 58.54 Km, 2-lane, Project Cost – 146.35 Cr.
34. Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala scheme. 3 (a) Pokharan – Fassund – Undu – Kashmir – Nimbala on NH-15. – 3 (b) Harsana – Phata to Uttarlai Aire base. Package No. BM-22). Total length – 150.60 Km, 2-Lane, Project Cost, 272 Cr.