Design and supervision of widending of existing 2 lanes to 6 lanes divided carriagway facility including Rehabilation of existing 2 lanes for km 273.500 to km 363.885 on Jaipur – Kishangarh, section of NH – 8 . Total Length – 90 Km, 6-Lane, Project Cost – 750 Cr.
Nature of project: Detailed Design + Supervision
Name of Client: GV Krishna / NHAI
Length: 90 Km
Estimated capital cost of Project (in Rs. crores): 750 Crores
Lane of Road: 6 Lane
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: EPC
Duration- From June 2003 to July 2005