Consultancy Services for Preparation of Feasibility Report for two laning of (i) Km. 0 to 200 of SH-20 comprising the section from Sikar to Nokha (the “Highway-I”), (ii) Km. 0 to 113 of SH-41 comprising the section from Fathehpur to Rajgarh (the “Highwya-II”), (iii) Km. 0 to Km. 144 of SH-60, SH-20, SH-19 comprising the section from Nagaur to Salasar (the “Highway-III”) and (iv) Km. 0 to Km. 71 of MDR-05 comprising the section from Bikaner to Jasrasar (the “Highway-IV”) totaling length – 531 Km (the project) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-5. Total length – 531 Km, 2 Lane with Paved Shoulders, Project Cost – 1349.5 Cr.
Nature of project: Detailed Project Report
Name of Client: Public Works Department (Government of Rajasthan)
Length: 531 kms.
Estimated capital cost of Project (in Rs. crores): 1349.5 Crores
Lane of Road: 2 Lane+ Paved Shoulder
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: PPP
Duration- From July 2014 to till date
Consultancy Services for Authority’s Engineer for Supervision of civil construction works for Construction of Northern Kota Bypass from Design Ch. 0.000 (km 391/100 of NH-76) to Design Ch. 10/300 (Rangpur road) [Package – I] and from Design Ch. 10/300 (Rangpur road) to Design Ch. 14.200 (km 11/700 of SH-33) with link road of 452m length with SH-33 [Package – II] in the state of Rajasthan on EPC mode under NH (O); Length: 14.2 Km; 2 Lane with paved shoulder; Flexible Pavement. Total Length – 14.2 Km, 2 Lane with Paved Shoulders, Project Cost – 150 Cr.
Nature of project: AE Supervision
Name of Client: Ministry of Roads Transportation and Highways
Length: 14.2 Km
Estimated capital cost of Project (in Rs. crores): 150 Crores
Lane of Road: 2 Lane+ Paved Shoulder
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: EPC
Duration- From May 2016 to May 2018