Consultancy Services for Preparation of Feasibility Report for two laning of (i) Phalodi – Nagaur comprising the section from Phalodi to Nagaur (the “Highway-I”), (ii) Beawar – Gulabpura comprising the section Beawar to Gulabpura (the “Highway-II”), (iii) Beawar – Pisangan – Tahla comprising the section from Beawar to Tahla (the “Highway-III”), (iv) Arai – Sarawar comprising the section Arai to Sarwar (the “Highway-IV”), (v) Kuchaman – Renwal – Kishangarh comprising the section Kucahman to Kishangarh (the “Highway-V”) and (vi) Talanpur – Dhanapa – Kawaspura (Mining) comprising the section from Talanpur to Kawaspura (the “Highway-VI”) totaling length – 360.81 Km (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package – 12. Total length – 360.81 Km, 2-Lane, Project Cost – 586.48 Cr.
Nature of project: Detailed Project Report
Name of Client: Public Works Department, Rajasthan
Length: 360.81 Km
Estimated capital cost of Project (in Rs. crores): 586.48 Crores
Lane of Road: 2 Lane
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: PPP
Duration- From Sept 2014 to till date