Consultancy services for Preparation Feasibility Report for two laning of (i) Uniara – Dooni – Anwa section of SH-34A (the “Highway-I”); (ii) Beawar – Masuda – Goyla section of SH-26A (the “Highway-II”); (iii) Sawarda – Rupangarh – Ajmer section of SH-100 (the “Highway-III”); (iv) Hurda – Banera section of SH-39A (the “Highway-IV”); (v) Banera – Bigod section of SH-39A (the “Highway-V”); totalling 282.39 Km. (the “Project”) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-23. Total length – 282.39 Km, 2-Lane, Project Cost – 529.4 Cr.
Nature of project: Detailed Project Report
Name of Client: Public Works Department (Government of Rajasthan)
Length: 282.39 Km
Estimated capital cost of Project (in Rs. crores): 529.4 Crores
Lane of Road: 2 Lane
Status: Substantially Complete
PPP / EPC / HAM / DBFOT / BOT: PPP
Duration- From June 2015 to till date