Independent Engineer services for development and construction of Two laning with paved shoulder of Salasar – Nagaur section of NH-65 from Km 45.400 (Design Chainage 151.141) to Km 171.170 (Design Chainage 270.735) – Design length (119.594 Km), Total Length – 119.594 Km in the State of Rajasthan on Hybrid Annuity mode under NHDP Phase-IV. Total Length – 119.59 Km, 2 Lane with Paved Shoulder, Project Cost – 480 Cr.
Nature of project: IE Supervision
Name of Client: National Highways Authority of India
Length: 119.594 Km
Estimated capital cost of Project (in Rs. crores): 480 Crores
Lane of Road: 2 Lane+ Paved Shoulder
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: HAM
Duration- From June 2017 to Jan 2019