Consultancy Services for Authority’s Engineer for Supervision of civil construction works for Construction of Northern Kota Bypass from Design Ch. 0.000 (km 391/100 of NH-76) to Design Ch. 10/300 (Rangpur road) [Package – I] and from Design Ch. 10/300 (Rangpur road) to Design Ch. 14.200 (km 11/700 of SH-33) with link road of 452m length with SH-33 [Package – II] in the state of Rajasthan on EPC mode under NH (O); Length: 14.2 Km; 2 Lane with paved shoulder; Flexible Pavement. Total Length – 14.2 Km, 2 Lane with Paved Shoulders, Project Cost – 150 Cr.
Nature of project: AE Supervision
Name of Client: Ministry of Roads Transportation and Highways
Length: 14.2 Km
Estimated capital cost of Project (in Rs. crores): 150 Crores
Lane of Road: 2 Lane+ Paved Shoulder
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: EPC
Duration- From May 2016 to May 2018