Proof checking of Construction of Toll Plaza in LHS carriageway at Km. 1054+967 to Km. 1055+467 (New Ch. 1055+217) and RHS carriagway at Km. 1059+050 to Km. 1059+450 (New Ch. 1059+350) and widening of carriagway from 4 Lane to 6 lane between proposed staggered Toll Plaza of NH 27 in the State of Rajasthan.
Nature of project: Proof checking
Name of Client: Apex Tarmac Pvt. Ltd., Ahmedabad (Gujrat)
Length: 0.900 meter
Estimated capital cost of Project (in Rs. crores): 22 Crores
Lane of Road: 4-6 Lane
Status: Completed