Consultancy services for Feasibility study and preparation of detailed project report for the proposed construction of bypass for Barmer city on NH-15 Jaisalmer – Barmer – Sanchore stretch as 2 lane with paved shoulders in the state of Rajasthan. Total Length – 21.760 Km, 2 Lane with Paved shoulders, Project cost – 125 Cr.
Nature of project: Detailed Project Report
Name of Client: PWD, NH Division, Rajasthan
Length: 21.760 Km
Estimated capital cost of Project (in Rs. crores): 125 Crores
Lane of Road: 2 Lane+ Paved Shoulder
Status: Completed
PPP / EPC / HAM / DBFOT / BOT: EPC
Duration- From May 2016 to March 2019